1. Length of Contract

1.1     This Contract starts on the Start Date. Services must not be delivered before the Start Date.

1.2    This Contract ends on the End Date unless terminated earlier.


2. The Services

Both Parties’ obligations

2.1     Both Parties agree to:

a.     act in good faith and demonstrate honesty, integrity, openness and accountability in their dealings with each other
b.     discuss matters affecting this Contract or the delivery of the Services, whenever necessary
c.     notify each other immediately of any actual or anticipated issues that could:
i.     significantly impact on the Services or the Charges
ii.     receive media attention, and
d.     comply with all applicable laws and regulations.

Buyer’s obligations

2.2     The Buyer must:

a.     provide the Supplier with any information it has reasonably requested to enable the delivery of the Services
b.     make decisions and give approvals reasonably required by the Supplier to enable delivery of the Services. All decisions and approvals must be given within reasonable timeframes, and
c.     pay the Supplier the Charges for the Services as long as the Supplier has delivered the Services and invoiced the Buyer, all in accordance with this Contract.

Supplier’s obligations

2.3     The Supplier must deliver the Services:

a.     on time and to the required performance standards or quality set out in the quote or reasonably notified by the Buyer to the Supplier from time to time
b.     within the amounts agreed as Charges, and
c.     with due care, skill and diligence, and to the appropriate professional standard or in accordance with good industry practice as would be expected from a leading supplier in the relevant industry.

2.4     The Supplier must:

a.     ensure that its Personnel have the necessary skills, experience, training and resources to successfully deliver the Services
b.     provide all equipment and resources necessary to deliver the Services, and

2.5     Where an Approved Personnel has been authorised by the Buyer in the quote, the Supplier must use the Approved Personnel in delivering the Services. The Supplier must obtain the Buyer’s prior written approval if it wishes to change any Approved Personnel.

2.6     If the Supplier is at the Buyer’s premises, the Supplier must observe the Buyer’s policies and procedures, including those relating to health and safety, and security requirements. The Buyer must tell the Supplier what the relevant policies and procedures are, and either give the Supplier a copy of them or provide an internet link.

2.7     If the nature of the Services requires it, the Supplier will deliver Services:

a.     in a manner that is culturally appropriate for Māori, Pacific and other ethnic or indigenous groups, and
b.     that respects the personal privacy and dignity of all participants and stakeholders.


3. Charges and payment

Charges & invoices

3.1     The Charges are the total maximum amount payable by the Buyer to the Supplier for delivery of the Services. Charges include Fees and, where agreed, Expenses.

3.2     The Supplier must provide valid tax invoices for all Charges on the dates or at the times specified in the quote. The Buyer has no obligation to pay the Charges set out on an invoice, which is not a valid tax invoice. A valid a tax invoice must:

a.     clearly show all GST due
b.     be in New Zealand currency or the currency stated in the quote
c.     be clearly marked ‘Tax invoice’
d.     contain the Supplier’s name, address and GST number, if the Supplier is registered for GST
e.     contain the Buyer’s name and address and be marked for the attention of the Buyer’s Contract Manager or such other person stated in the quote
f.     state the date the invoice was issued
g.     name this Contract and provide a description of the Services supplied, including the amount of time spent in the delivery of the Services if payment is based on an Hourly Fee Rate
h.     contain the Buyer’s contract reference or purchase order number if there is one
i.     state the Charges due, calculated correctly, and
j.     be supported by GST receipts if Expenses are claimed and any other verifying documentation reasonably requested by the Buyer.

Payment

3.3     If the Buyer receives a valid tax invoice on or before the 3rd Business Day of the month, the Buyer must pay that tax invoice by the 20th calendar day of that month. Any valid tax invoice received after the 3rd Business Day of the month will be paid by the Buyer on the 20th calendar day of the month following the month it is received. The Buyer’s obligation to pay is subject to clauses 3.2, 3.4 and 11.10.

3.4     If the Buyer disputes a tax invoice or any part of a tax invoice that complies with clause 3.2, the Buyer must notify the Supplier within 10 Business Days of the date of receipt of the tax invoice. The Buyer must pay the portion of the tax invoice that is not in dispute. The Buyer may withhold payment of the disputed portion until the dispute is resolved.


4. Contract management

Contract Manager

4.1     The persons named in the quote as the Contract Managers are responsible for managing the Contract, including:

a.     managing the relationship between the Parties
b.     overseeing the effective implementation of this Contract, and
c.     acting as a first point of contact for any issues that arise.

Changing the Contract Manager

4.2     If a Party changes its Contract Manager it must tell the other Party, in writing, the name and contact details of the replacement within 5 Business Days of the change.


5. Information management

Information and Records

5.1     The Supplier must:

a.     keep and maintain Records in accordance with prudent business practice and all applicable laws
b.     make sure the Records clearly identify all relevant time and Expenses incurred in providing the Services
c.     make sure the Records are easy to access, and
d.     keep the Records safe.

5.2     The Supplier must give information to the Buyer relating to the Services that the Buyer reasonably requests. All information provided by the Supplier must be in a format that is usable by the Buyer, and delivered within a reasonable time of the request.

5.3     The Supplier must co-operate with the Buyer to provide information immediately if the information is required by the Buyer to comply with an enquiry or its statutory, parliamentary, or other reporting obligations.

5.4     The Supplier must make its Records available to the Buyer during the term of the Contract and for 7 years after the End Date (unless already provided to the Buyer earlier).

5.5     The Supplier must make sure that Records provided by the Buyer or created for the Buyer, are securely managed and securely destroyed on their disposal.

Reports

5.6     The Supplier must prepare and give to the Buyer the reports stated in the quote, by the due dates stated in the quote.


6. The contractual relationship

Independent contractor

6.1     Nothing in this Contract constitutes a legal relationship between the Parties of partnership, joint venture, agency, or employment. The Supplier is responsible for the liability of its own, and its Personnel’s, salary, wages, holiday or redundancy payments and any GST, corporate, personal and withholding taxes, ACC premiums or other levies attributable to the Supplier’s business or the engagement of its Personnel.

Neither Party can represent the other

6.2     Neither Party has authority to bind or represent the other Party in any way or for any purpose.

Permission to transfer rights or obligations

6.3     The Supplier may transfer any of its rights or obligations under this Contract only if it has the Buyer’s prior written approval. The Buyer will not unreasonably withhold its approval.

7. Subcontractors

Rules about subcontracting

7.1     The Supplier must not enter into a contract with someone else to deliver any part of the Services without the Buyer’s prior written approval. In selecting an appropriate Subcontractor the Supplier must be able to demonstrate value for money.

The Supplier’s responsibilities

7.2     The Supplier is responsible for ensuring the suitability of any Subcontractor and the Subcontractor’s capability and capacity to deliver that aspect of the Services being subcontracted.

7.3     The Supplier must ensure that:

a.     each Subcontractor is fully aware of the Supplier’s obligations under this Contract, and
b.     any subcontract it enters into is on terms that are consistent with this Contract.

7.4     The Supplier continues to be responsible for delivering the Services under this Contract even if aspects of the Services are subcontracted.


8. Insurance

Where insurance is a requirement

8.1     It is the Supplier’s responsibility to ensure its risks of doing business are adequately covered, whether by insurance or otherwise. If required in the quote, the Supplier must have the insurance specified in the quote and the Supplier must:

a.     take out insurance, with a reputable insurer, and maintain that insurance cover for the term of this Contract and for a period of 3 years after the End Date, and
b.     within 10 Business Days of a request from the Buyer provide a certificate confirming the nature of the insurance cover and proving that each policy is current.


9. Conflicts of Interest

Avoiding Conflicts of Interest

9.1     The Supplier warrants that as of the Start Date, it has no Conflict of Interest in providing the Services or entering into this Contract.

9.2     The Supplier must do its best to avoid situations that may lead to a Conflict of Interest arising.

Obligation to tell the Buyer

9.3     The Supplier must tell the Buyer immediately, and in writing, if any Conflict of Interest arises in relation to the Services or this Contract. If a Conflict of Interest does arise the Parties must discuss, agree and record in writing whether it can be managed and, if so, how it will be managed. Each Party must pay its own costs in relation to managing a Conflict of Interest.


10. Resolving disputes

Steps to resolving disputes

10.1     The Parties agree to use their best endeavours to resolve any dispute or difference that may arise under this Contract. The following process will apply to disputes:

a.     a Party must notify the other if it considers a matter is in dispute
b.     the Contract Managers will attempt to resolve the dispute through direct negotiation
c.     if the Contract Managers have not resolved the dispute within 10 Business Days of notification, they will refer it to the Parties’ senior managers for resolution, and
d.     if the senior managers have not resolved the dispute within 10 Business Days of it being referred to them, the Parties shall refer the dispute to mediation or some other form of alternative dispute resolution.

10.2     If a dispute is referred to mediation, the mediation will be conducted:

a.     by a single mediator agreed by the Parties or if they cannot agree, appointed by the Chair of LEADR NZ Inc.
b.     on the terms of the LEADR NZ Inc. standard mediation agreement, and
c.     at a fee to be agreed by the Parties or if they cannot agree, at a fee determined by the Chair of LEADR NZ Inc.

10.3     Each Party will pay its own costs of mediation or alternative dispute resolution under this clause 10.

Obligations during a dispute

10.4     If there is a dispute, each Party will continue to perform its obligations under this Contract as far as practical given the nature of the dispute.

Taking court action

10.5     Each Party agrees not to start any court action in relation to a dispute until it has complied with the process described in clause 10.1, unless court action is necessary to preserve a Party’s rights.


11. Ending this Contract

Termination by the Supplier

11.1     The Supplier may terminate this Contract by giving 20 Business Days Notice to the Buyer, if the Buyer fails to pay Charges that are properly due, and are not in dispute under clause 3.4. The Charges must be overdue by 20 Business Days and the Supplier must have first brought this to the Buyer’s attention in writing within this period.

11.2     At any time during the term of this Contract the Supplier may notify the Buyer that it wishes to terminate this Contact by giving 20 Business Days Notice. The Buyer will, within 20 Business Days following receipt of the Supplier’s Notice, notify the Supplier whether, in its absolute discretion, it consents to the Supplier’s Notice of termination. If the Buyer:

a.     consents, the Contract will be terminated on a date that is mutually agreed between the Parties, or
b.     does not consent, the Contract will continue in full force as if the Supplier’s Notice of termination had not been given.

11.3     The Supplier may also terminate this Contract under clause 11.9.

Termination by the Buyer

11.4     The Buyer may terminate this Contract at any time by giving 20 Business Days Notice to the Supplier.

11.5     The Buyer may terminate this Contract immediately, by giving Notice, if the Supplier:

a.     becomes bankrupt or insolvent
b.     has an administrator, receiver, liquidator, statutory manager, mortgagee’s or chargee’s agent appointed
c.     becomes subject to any form of external administration
d.     ceases for any reason to continue in business or to deliver the Services
e.     is unable to deliver the Services for a period of 20 Business Days or more due to an Extraordinary Event
f.     requires the supply of Services within the period of an Extraordinary Event
g.     is in breach of any of its obligations under this Contract and the breach cannot be remedied
h.     repeatedly fails to perform or comply with its obligations under this Contract whether those obligations are minor or significant
i.     does something or fails to do something that, in the Buyer’s opinion, results in damage to the Buyer’s reputation or business
j.     has a Conflict of Interest that in the Buyer’s opinion is so material as to impact adversely on the delivery of the Services, the Buyer, or
k.     provides information to the Buyer that is misleading or inaccurate in any material respect.

Termination by a Party if a breach has not been remedied

11.6     If a Party fails to meet the requirements of this Contract (defaulting Party) and the other Party (non-defaulting Party) reasonably believes that the failure can be remedied, the non-defaulting Party must give a Notice (default Notice) to the defaulting Party.

11.7     A default Notice must state:

a.     the nature of the failure
b.     what is required to remedy it, and
c.     the time and date by which it must be remedied.

11.8     The period allowed to remedy the failure must be reasonable given the nature of the failure.

11.9     If the defaulting Party does not remedy the failure as required by the default Notice, the non-defaulting Party may terminate this Contract immediately by giving a further Notice.

11.10     If the Buyer gives a default Notice to the Supplier, the Buyer may also do one or both of the following things:

a.     withhold any payment of Fees due until the failure is remedied as required by the default Notice, and or
b.     if the failure is not remedied as required by the default Notice, deduct a reasonable amount from any Fees due to reflect the reduced value of the Services to the Buyer.

Supplier’s obligations on termination or expiry of this Contract

11.11     On giving or receiving a Notice of termination, the Supplier must:

a.     stop providing the Services
b.     comply with any conditions contained in the Notice, and
c.     immediately do everything reasonably possible to reduce its losses, costs and expenses arising from the termination of this Contract.

11.12     On termination or expiry of this Contract, the Supplier must, if requested by the Buyer, immediately return or securely destroy all Confidential Information and other material or property belonging to the Buyer.

Consequences of termination or expiry of this Contract

11.13     The termination or expiry of this Contract does not affect those rights of each Party which:

a.     accrued prior to the time of termination or End Date, or
b.     relate to any breach or failure to perform an obligation under this Contract that arose prior to the time of termination or End Date.

11.14     If this Contract is terminated the Buyer:

a.     will only be liable to pay Charges that were due for Services delivered before the effective date of termination, and
b.     may recover from the Supplier or set off against sums due to the Supplier, any Charges paid in advance that have not been incurred.

Handing over the Services on termination or expiry of this Contract

11.15     The Supplier will, within 10 Business Days of the End Date, provide all reasonable assistance and cooperation necessary to facilitate a smooth handover of the Services to the Buyer or any person appointed by the Buyer.

11.16     If the Parties agree, the Supplier will provide additional assistance to support any replacement supplier to deliver the Services. This support may be for a period of up to 3 months from the date of termination and at a reasonable fee to be agreed between the Parties, based on the Fees and Expenses stated in this Contract.


12. Confidential Information

Protection of Confidential Information

12.1     Each Party confirms that it has adequate security measures to safeguard the other Party’s Confidential Information from unauthorised access or use by third parties, and that it will not use or disclose the other Party’s Confidential Information to any person or organisation other than:

a.     to the extent that use or disclosure is necessary for the purposes of providing the Deliverables or Services or in the case of the Buyer using the Deliverables or Services
b.     if the other Party gives prior written approval to the use or disclosure
c.     if the use or disclosure is required by law (including under the Official Information Act 1982), Ministers or parliamentary convention, or
d.     in relation to disclosure, if the information has already become public, other than through a breach of the obligation of confidentiality by one of the Parties.

Obligation to inform staff

12.2     Each Party will ensure that its Personnel:

a.     are aware of the confidentiality obligations in this Contract, and
b.     do not use or disclose any of the other Party’s Confidential Information except as allowed by this Contract.


13. Notices

Delivery of Notices

13.1     All Notices to a Party must be delivered by hand or sent by post, courier, fax or email to that Party’s address for Notices stated in the quote.

13.2     Notices must be signed or in the case of email sent by the appropriate manager or person having authority to do so.

Receipt of Notices

13.3     A Notice will be considered to be received:

a.     if delivered by hand, on the date it is delivered
b.     if sent by post within New Zealand, on the 3rd Business Day after the date it was sent
c.     if sent by post internationally, on the 7th Business Day after the date it was sent
d.     if sent by courier, on the date it is delivered, or
e.     if sent by email, at the time the email enters the recipient’s information system as evidenced by a delivery receipt requested by the sender and it is not returned undelivered or as an error.

13.4     A Notice received after 5pm on a Business Day or on a day that is not a Business Day will be considered to be received on the next Business Day.


14. Extraordinary Events

No fault if failure due to an Extraordinary Event

14.1     Neither Party will be liable to the other for any failure to perform its obligations under this Contract where the failure is due to an Extraordinary Event.

Obligations of the affected Party

14.2     A Party who wishes to claim suspension of its obligations due to an Extraordinary Event must notify the other Party as soon as reasonably possible. The Notice must state:

a.     the nature of the circumstances giving rise to the Extraordinary Event
b.     the extent of that Party’s inability to perform under this Contract
c.     the likely duration of that non-performance, and
d.     what steps are being taken to minimise the impact of the Extraordinary Event on the delivery of Services.

Alternative arrangements requiring immediate termination

14.3     If the Buyer, acting reasonably, requires the Services to be supplied during the period affected by an Extraordinary Event, then despite clause 14.4, the Buyer may terminate this Contract immediately by giving Notice.

Termination of Contract

14.4     If a Party is unable to perform any obligations under this Contract for 20 Business Days or more due to an Extraordinary Event, the other Party may terminate this Contract immediately by giving Notice.


15. General

Changes to this Contract

15.1     Any change to this Contract is called a Variation. A Variation must be agreed by both Parties and recorded:

a.     in writing and signed by both Parties, or
b.     through an exchange of emails where the authors have delegated authority to approve the Variation.

This is the entire Contract

15.2     This Contract, including any Variation, records everything agreed between the Parties relating to the Services. It replaces any previous communications, negotiations, arrangements or agreements that the Parties had with each other relating to the Services before this Contract was signed, whether they were verbal or in writing.

Waiver

15.3     If a Party breaches this Contract and the other Party does not immediately enforce its rights resulting from the breach that:

a.     does not mean that the Party in breach is released or excused from its obligation to perform the obligation at the time or in the future, and
b.     does not prevent the other Party from exercising its rights resulting from the breach at a later time.

New Zealand law, currency and time

15.4     This Contract will be governed and interpreted in accordance with the laws of New Zealand. All money is in New Zealand dollars, unless the quote specifies a different currency. Dates and times are New Zealand time.

Publication of information about this Contract

15.5     The Supplier may disclose the existence of this Contract but must obtain the Buyer’s prior written approval before making reference to the Buyer or this Contract in its publications, public statements, promotional material or promotional activities about this Contract.

15.6     Each Party undertakes not to post on websites or social networking sites and not to publicly display objectionable or derogatory comments about the Services, this Contract, each other or any of its Personnel and to ensure that its Personnel do not do so.

Acceptance of Contract

15.7    The Buyer is taken to have exclusively accepted and is immediately bound, jointly and severally, by these terms and conditions if the Buyer
places an order for or accepts delivery of any Services.

No poaching

15.8     During the term of this Contract and for a period of 6 months after the End Date neither Party shall, without the other’s written consent, deliberately solicit for employment or hire any person who is or has been employed by the other and involved in the delivery of the Services. This does not apply where a person has responded to a legitimate advertisement.

Clauses that remain in force

15.9     The clauses that by their nature should remain in force on expiry or termination of this Contract do so, including clauses 5 (Information management), 8 (Insurance), 10 (Resolving disputes), 11 (Ending this Contract), 12 (Confidential Information), 15 (General) and 16 (Definitions).

Precedence

15.10     If there is any conflict or difference between the documents forming this Contract (as stated on Page 1) then the order of precedence is:

a.     a Variation agreed between the Parties under clause 15.1
b.     the quote
c.     any Attachment to the quote


16. Definitions

16.1     When used in this Contract the following terms have the meaning beside them:

Attachment Any supplementary document named in the quote as an Attachment to this Contract.

Approved Personnel A person who is engaged by the Supplier to deliver the Services and is named in the quote. The Supplier must use this person in the delivery of the Services and cannot change them without first obtaining the Buyer’s written approval.

Business Day A day when most businesses are open for business in New Zealand. It excludes Saturday, Sunday, and public holidays. A Business Day starts at 8.30am and ends at 5pm.

Buyer The Buyer is the purchaser of the Services. The Buyer is named on the quote.

Charges The total amount payable by the Buyer to the Supplier as stated in the quote. The Supplier’s Charges include Fees and any Expenses stated in the quote. Charges are payable on successful delivery of the Services provided a valid tax invoice has been submitted.

Confidential Information Information that:
a. is by its nature confidential
b. is marked by either Party as ‘confidential’, ‘in confidence’, ‘restricted’ or ‘commercial in confidence’
c. is provided by either Party or a third party ‘in confidence’
d. either Party knows or ought to know is confidential, or
e. is of a sensitive nature or commercially sensitive to either Party.

Conflict of Interest A Conflict of Interest arises if a Party or its Personnel’s personal or business interests or obligations do or could conflict or be perceived to conflict with its obligations under this Contract. It means that its independence, objectivity or impartiality can be called into question. A Conflict of Interest may be:
a. actual: where the conflict currently exists
b. potential: where the conflict is about to happen or could happen, or
c. perceived: where other people may reasonably think that a person is compromised.

Contract The legal agreement between the Buyer and the Supplier that comprises the quote and any Variation Attachment.

Contract Manager The person named in the quote as the Contract Manager. Their responsibilities are listed in clause 4.1

Deliverables A tangible output resulting from the delivery of the Services as stated in the quote. A deliverable may be a document, a piece of equipment, goods, information or data stored by any means including all copies and extracts of the same.

End Date The earlier of the date this Contract is due to end as stated in the quote, the date of termination as set out in a Notice of termination or any other date agreed between the Parties as the date the Contract is to end.

Expenses Any actual and reasonable out-of-pocket costs incurred by the Supplier in the delivery of the Services and agreed to in the quote.

Extraordinary Event An event that is beyond the reasonable control of the Party immediately affected by the event. An Extraordinary Event does not include any risk or event that the Party claiming could have prevented or overcome by taking reasonable care. Examples include:
a. acts of God, lightning strikes, earthquakes, tsunamis, volcanic eruptions, floods, storms, explosions, fires, pandemics and any natural disaster
b. acts of war (whether declared or not), invasion, actions of foreign enemies, military mobilisation, requisition or embargo
c. acts of public enemies, terrorism, riots, civil commotion, malicious damage, sabotage, rebellion, insurrection, revolution or military usurped power or civil war, or
d. contamination by radioactivity from nuclear substances or germ warfare or any other such hazardous properties.

Fees The amount payable to the Supplier for the time spent in delivery of the Services calculated on the basis stated in the quote, excluding any Expenses.

GST The goods and services tax payable in accordance with the New Zealand Goods and Services Tax Act 1985.

Hourly Fee Rate If the Supplier’s fee rate is expressed as an Hourly Fee Rate this is the Fee payable for each hour spent delivering the Services.

Milestone A phase or stage in the delivery of Services resulting in a measurable output. Payment of Fees is usually due on the satisfactory delivery of a Milestone.

Notice A formal or legal communication from one Party to the other that meets the requirements of clause 14.

Party The Buyer and the Supplier are each a Party to this Contract, and together are the Parties.

Personnel All individuals engaged by either Party in relation to this Contract or the delivery of Services. Examples include: the owner of the business, its directors, employees, Subcontractors, agents, external consultants, specialists, technical support and co-opted or seconded staff. It includes Approved Personnel.

Records All information and data necessary for the management of this Contract and the delivery of Services. Records include, but are not limited to, reports, invoices, letters, emails, notes of meetings, photographs and other media recordings. Records can be hard copies or soft copies stored electronically.

Services All work, tasks and Deliverables, including those stated in the quote, that the Supplier must perform and deliver under this Contract.

Schedule An attachment to this Contract with the title ‘Schedule’.

Start Date The date when this Contract starts as stated in the quote.

Subcontractor A person, business, company or organisation contracted by the Supplier to deliver or perform part of the Supplier’s obligations under this Contract.

Supplier The person, business, company or organisation named as the Supplier on page 1. It includes its Personnel, successors, and permitted assignees.

Variation A change to any aspect of this Contract that complies with clause 16.1.